Roads indicates culture of the nation

“Road indicates culture of the nation” – So true… During my recent road trip from Hyderabad to Bangalore (Bengaluru) I found this sign board at many places. Ironically, at all the places I found this sign board road were in bad condition.

I am sure that was not the intention of National Highway Authority of India (NHAI), because the complete 4 lane highway is rebuilt. And believe me I am not being sarcastic. GOI is investing a lot of money on improving the road network, just look at these facts:

National Highways Authority of India (NHAI) is mandated to implement National Highways Development Project (NHDP) which is

  • India ‘s Largest ever highways project
  • World class roads with uninterrupted traffic flow

The National Highways have a total length of 66,590 km (41377 miles) to serve as the arterial network of the country. The development of National Highways is the responsibility of the Government of India. The Government of India has launched major initiatives to upgrade and strengthen National Highways through various phases of National Highways Development project (NHDP), which are briefly as under:

  • NHDP Phase I : NHDP Phase I was approved by Cabinet Committee on Economic Affairs (CCEA) in December 2000 at an estimated cost of Rs.30,000 crore (approx. $6000 Million) comprises mostly of GQ (5,846 km) and NS-EW Corridor (981km), port connectivity (356 km) and others (315 km).
  • NHDP Phase II : NHDP Phase II was approved by CCEA in December 2003 at an estimated cost of Rs.34,339 crore (approx. $6868 Millions) (2002 prices) comprises mostly NS-EW Corridor (6,161 km) and other National Highways of 486 km length, the total length being 6,647 km. The total length of Phase II is 6,647 km.
  • NHDP Phase-III: Government approved on 5.3.2005 upgradation and 4 laning of 4,035 km of National Highways on BOT basis at an estimated cost of Rs. 22,207 crores (approx. $4441 Millions) (2004 prices). Government approved in April 2007 upgradation and 4 laning at 8074 km at an estimated cost of Rs. 54,339 crore (approx $10867 Millions).
  • NHDP Phase IV: CCEA has approved on 5.10.2006 six laning of 6,500 km of existing 4 lane highways under NHDP Phase V (on DBFO basis). Six laning of 6,500 km includes 5,700 km of GQ and other stretches.
  • NHDP Phase V: CCEA has approved on November 2006 for 1000 km of expressways at an estimated cost of Rs. 16680 crore (approx. $3336 Millions).
  • NHDP Phase VI: CCEA has approved on December 2007 for 700 km of Ring Roads, Bypasses and flyovers and selected stretches at an estimated cost of Rs. 16680 crores (approx. $3336 Millions).

To be continued…

  • http://tides.wordpress.com/ TiDeS

    whr is the sign board???

  • http://tides.wordpress.com/ TiDeS

    whr is the sign board???

Share

Liked By

Monthly Archive

Photos From Reflections

Alien Tweets...

Powered by Twitter Tools

free counters

thealienworld.com
74/100

I support…

Wikipedia Affiliate Button Wikipedia Affiliate Button
Performance Optimization WordPress Plugins by W3 EDGE